Kalealtı HEPP Project (15 MW)
Kadirli-Osmaniye / Turkey
Regulator Structure, Downstream View
Regulator Structure, Downstream View
Regulator Structure Upstream View
Regulator Lake Area
Head Pond
Penstock Line
Regulator Structure, Downstream View
Bifurcation Pipe (Under Pressure Test)
Power House, Switch Yard
Inlet Structure for Transition line
Regulator Structure Upstream View
CLIENT: TEKTUĞ ELEKTRİK ÜRETİM A.S. (Under the control of the Ministry of Energy and Energy Market Regulatory Authority)
PROJECT: KALEALTI HEPP (15 MW), KADİRLİ-OSMANİYE / TURKEY
CONTRACTOR: Çiltuğ A.Ş.
SCOPE:
- Complete civil works and mechanical and electrical equipment fabrication and erection works.
- Complete civil works for regulator structure, water transmission canal and tunnel (960 m), head pond and power house.
- Complete fabrication and erection of hydro-mechanical equipment and penstock lines, power house crane.
- Complete erection of spiral cases, butterfly valves, turbine and generator groups.
- Complete installation of switch yard and energy transmission line.
TOTAL EQUIPMENT WEIGHT: 640 Tons
COMPLETED IN: 2006