Projects

Kalealtı HEPP Project (15 MW)

Kadirli-Osmaniye / Turkey

CLIENT: TEKTUĞ ELEKTRİK ÜRETİM A.S. (Under the control of the Ministry of Energy and Energy Market Regulatory Authority)

PROJECT: KALEALTI HEPP (15 MW), KADİRLİ-OSMANİYE / TURKEY

CONTRACTOR: Çiltuğ A.Ş.

SCOPE:

  • Complete civil works and mechanical and electrical equipment fabrication and erection works.
  • Complete civil works for regulator structure, water transmission canal and tunnel (960 m), head pond and power house.
  • Complete fabrication and erection of hydro-mechanical equipment and penstock lines, power house crane.
  • Complete erection of spiral cases, butterfly valves, turbine and generator groups.
  • Complete installation of switch yard and energy transmission line.

TOTAL EQUIPMENT WEIGHT: 640 Tons

COMPLETED IN: 2006