Karakaya Dam & HEPP (8x300 MW)
Diyarbakır / Turkey
Regulator Structure Upstream View
Spiral Case and Stay Ring, During Erection
Regulator Structure, Downstream View
CLIENT: General Directorate of State Hydraulic Works (DSİ) of Turkey
PROJECT: KARAKAYA DAM AND HEPP (6x300 MW), ÇÜNGÜŞ-DIYARBAKIR / TURKEY
CONTRACTOR: Italstrade-Recchi Spa / Italy
SUB-CONTRACTOR: Noell GmbH and Çiltuğ Joint Venture
SCOPE:
- Fabrication, sandblasting, painting and erection of all permanent hydro-mechanical equipment such of Penstocks
- Penstocks: Ø6 m L= 80 mx6 lines, 5,500 tons Spillway radial gates: 14 mx10 m, 1,500 tons Water intake equipment: 2,700 tons
- Bottom outlet tunnel steel lining and gates: 3,250 tons Draft tube gates: 650 tons
- Power house machine hall cranes and other cranes erections: 1,900 tons.
TOTAL WEIGHT: 15,500 Tons
COMPLETED IN: 1989