Completed Projects - Turkey

Atatürk Dam and HEPP (8 x 300 MW)

1994 / Şanlıurfa, Turkey

  • CLIENT: General Directorate of State Hydraulic Works (DSİ) of Turkey
  • PROJECT: Atatürk Dam ve HEPP (8 Units, 300 MW each) / Şanlıurfa, Turkey
  • CONTRACTOR: Noell GmbH / Germany, Sulzer-Escher Wyss Ltd. & Asea Brown Boveri Co. / Switzerland
  • SUB-CONTRACTOR: Çiltuğ Heat Industry and Trade Co.
  • SCOPE: Fabrication, sandblasting, painting, erection and testing of Penstocks, supports and expansion joints (8Units of Ø=5.5m to Ø=7.25m t=22mm to 44mm and L(total)= 5200m, Surface for sand blasting and painting total area: 250,000m2
  • TOTAL WEIGHT: 26.600 Ton
  • COMPLETED IN: 1994