- Kargilik HEPP
- Kalealtı HEPP
- Keban HEPP
- Erkenek HEPP
- Atatürk Dam and HEPP
- Karakaya Dam and HEPP
- Karkamış Dam and HEPP
- Batman Dam and HEPP
- Kralkızı Dam and HEPP
- Şanlıurfa Plain Irrigation Project
- Sır Dam and HEPP
- Borçka - Muratlı HEPP Project
- Kargilik HEPP Project
- Akköy HEPP
- Feslek HEPP Project
- Suşehri HEPP Project
- Gönen HEPP
- Şanlıurfa HEPP
- Silopi 1-B Project
- Hamzalı HEPP Project
- Akköy HEPP Project
- Akköy HEPP Project
- Akocak HEPP Project
- Çalkışla HEPP Project
- Erkenek HEPP Project
- Kalen I-II HEPP Project
- Keklicek HEPP
- Uzundere HEPP
- Reşadiye 1,2,3 HEPP
- Uzunçayır HEPP / Osmaniye
- Ceyhan HEPP (Oşkan & Berkman)
- Pressure Cement Silos
- Kuşluk 2 HEPP
- Hacınınoğlu HEPP
- Andırın Project
- Yedigöl-Aksu HEPP
- Yedisu HEPP
- Yedigöze HEPP
- Aksu HEPP
- Darıca HEPP
- Kandil HEPP
- Akköy II HEPP
- Jiroft Dam and HEPP / Iran
- Pehur High Level Canal Project (PHLC) / Pakistan
- Nassireyah Pumping Station and Inverted Siphon Projects / Iraq
- Nassireyah Drainage Pump Station Projects / Iraq
- Uleberg Project / Norway
- Matka Project / Macedonia
- Lake Hodges Project / USA
- Soenna Hoy Project / Norway
- Soenna Lav Project / Norway
- Kalimanci Project / Czech Republic
- Nam Theun 2 Project / Cambodia
- Raqqa, El-Bab and Tadeff Projects / Syria
- Double Deck Floating Roof Crude - Oil Store Tank For Tuba Tank Field / Iraq
- Process Tanks, Bad Oil Tank and Fire Fighting Water Tanks for Ratawi Oil Field / Iraq
- Rashedeyah Project / Iraq
- Sisimiud Project / New Zealand
- Tartous Project / SYRIA
- Nasiriyah & Dewaniyah Project

Completed Projects - Turkey
Keban HEPP Project (5.5 MW)
2007 / Elazığ, Turkey
- CLIENT: Tektuğ Elektrik Üretim A.Ş.
- PROJECT: Keban HEPP Project (5 MW) / Elazığ, Turkey
- CONTRACTOR: Çiltuğ Heat Industry and Trade Co.
- SCOPE: Complete Civil Works and Mechanical and Electrical Equipment Fabrication and Erection Works (one number of draft tube stoplog gate, loading pool trashrack, one number of water intake trashrack, one number of silt discharge gate, ıne number of loading pool stoplog gate, one number of steel structure for power house, one number of power house crane in capacity of 30 tons, one number of radial gate, 165mt. Penstocks, spiral casing, stayring, energy transmission line, switch yard, electromechanical equipment, all other hydromechanical equipments, central building.)
- TOTAL WEIGHT: 200 Ton.
- COMPLETED IN: 2007