- Kargilik HEPP
- Kalealtı HEPP
- Keban HEPP
- Erkenek HEPP
- Atatürk Dam and HEPP
- Karakaya Dam and HEPP
- Karkamış Dam and HEPP
- Batman Dam and HEPP
- Kralkızı Dam and HEPP
- Şanlıurfa Plain Irrigation Project
- Sır Dam and HEPP
- Borçka - Muratlı HEPP Project
- Kargilik HEPP Project
- Akköy HEPP
- Feslek HEPP Project
- Suşehri HEPP Project
- Gönen HEPP
- Şanlıurfa HEPP
- Silopi 1-B Project
- Hamzalı HEPP Project
- Akköy HEPP Project
- Akköy HEPP Project
- Akocak HEPP Project
- Çalkışla HEPP Project
- Erkenek HEPP Project
- Kalen I-II HEPP Project
- Keklicek HEPP
- Uzundere HEPP
- Reşadiye 1,2,3 HEPP
- Uzunçayır HEPP / Osmaniye
- Ceyhan HEPP (Oşkan & Berkman)
- Pressure Cement Silos
- Kuşluk 2 HEPP
- Hacınınoğlu HEPP
- Andırın Project
- Yedigöl-Aksu HEPP
- Yedisu HEPP
- Yedigöze HEPP
- Aksu HEPP
- Darıca HEPP
- Kandil HEPP
- Akköy II HEPP
- Jiroft Dam and HEPP / Iran
- Pehur High Level Canal Project (PHLC) / Pakistan
- Nassireyah Pumping Station and Inverted Siphon Projects / Iraq
- Nassireyah Drainage Pump Station Projects / Iraq
- Uleberg Project / Norway
- Matka Project / Macedonia
- Lake Hodges Project / USA
- Soenna Hoy Project / Norway
- Soenna Lav Project / Norway
- Kalimanci Project / Czech Republic
- Nam Theun 2 Project / Cambodia
- Raqqa, El-Bab and Tadeff Projects / Syria
- Double Deck Floating Roof Crude - Oil Store Tank For Tuba Tank Field / Iraq
- Process Tanks, Bad Oil Tank and Fire Fighting Water Tanks for Ratawi Oil Field / Iraq
- Rashedeyah Project / Iraq
- Sisimiud Project / New Zealand
- Tartous Project / SYRIA
- Nasiriyah & Dewaniyah Project

Completed Projects - Turkey
Kargilik HEPP Project (2 x 12MW)
2005 / Andırın - Kahramanmaraş, Turkey
- CLIENT: Tektuğ Elektrik Üretim A.Ş.
- PROJECT: Kargilik HEPP Project (2 x 12MW) / Andırın - Kahramanmaraş, Turkey
- CONTRACTOR: Çiltuğ Heat Industry and Trade Co.
- SCOPE: Complete Civil Works and Mechanical and Electrical Equipment Fabrication and Erection Works.(Two numbers of Radial gates in dimension of R=7.5m X 6.3m x 9.0m, one set of fixed wheel gates with 4 parts in dimension of 6.3mx9m, Bottom outlet gate in dimension of 3mx2m, Penstocks in dimension of Ø2.5m L=612m, spiral casing, stayring, energy transmission line, switch yard, electromechanical equipment, Other all hydromechanical equipments, central building, powerhouse 50+5tons capacity in 10m clearance overhead crane)
- TOTAL WEIGHT: 1.000 Ton.
- COMPLETED IN: 2005